Who can forge the parts Europe's submarines and reactors depend on — and who gets priority?

The DFM report on this question — Heavy Forgings, Defence Demand and Priority Powers 19-page PDF · immediate download · €299

Follow Energetics, Propellants & Smart Munitions — free alerts: new analyses and updates on this theme

Privacy.

This public thread presents the concise analytical answer. The complete evidence, source base and assessment are available below.

Part of our Policy, Procurement & Institutions and Defence & Dual-Use Companies coverage →

Platform publication · DFM Analysis report · 2026-11-20

Analysis as of 08 October 2026.

Key facts

  • Sheffield Forgemasters' recapitalisation was raised from £900 million to £1.3 billion; the forge is owned by the UK Ministry of Defence, which had invested £542 million of that total (Sheffield Forgemasters, 10 June 2025; UK House of Lords written answer HL15445, answered 26 March 2026).
  • Framatome's Forge+ at Le Creusot is costed at €579 million and justified chiefly by civil reactor orders (Framatome & RTE, Projet Forge+ dossier de concertation, May 2025).
  • Sheffield Forgemasters forges 105 mm and 155 mm artillery barrels for Ukraine — the first British-made in almost two decades (UK Ministry of Defence, 15 July 2026).
  • For the largest reactor parts, Framatome depends on Japan Steel Works (report, section 3).
  • The instruments of priority are the EDIP Regulation (EU) 2025/2643 and the French Code de la défense requisition powers (OJEU 29 December 2025; Code de la défense, Art. L. 1339-2).

In June 2025 the recapitalisation of Sheffield Forgemasters, a forge owned by the United Kingdom's Ministry of Defence, was raised from £900 million to £1.3 billion. Two weeks earlier Framatome had opened a public consultation on Forge+, a new forge at Le Creusot costed at €579 million. Both add the same industrial ability: turning very large steel ingots into the plates and pipework that make up the primary circuit of a nuclear reactor. The same class of press and skills also serves the British forge's stated defence roles — the submarine and warhead programmes — and the artillery barrels it now forges for Ukraine.

Why do two state-backed forges matter at once?

Heavy-forging capacity is a small number of large-tonnage presses plus the people and certified cycles to qualify what they produce. It is inherently dual-use, which is why the same site can appear in a submarine programme, a civil nuclear programme and an artillery line. Both of Europe's current build-outs are state-backed. Sheffield Forgemasters was taken into public hands and rebuilt around the submarine programme; its £1.3 billion plan is described by the company as driven by its MoD owner, which had put in £542 million, and includes a new forging line and a roughly 30,000-square-metre machining hall with 17 new machining centres. Le Creusot's Forge+ adds capacity on an explicit condition — that civil reactor orders arrive — so future military-relevant capacity is being built on the back of a civil programme and moves only when that programme does.

What actually limits the capacity — steel or people?

Not the steel. The report is direct that the binding constraint is people and qualification: for the critical roles there are no quick substitutes, and a press without qualified operators and certified cycles is stranded capital, not capacity. Adding a forge solves little unless the workforce is qualified at the same time, and that is measured in years. The supply side is concentrated too: about two thirds of Le Creusot's ingots come from ArcelorMittal Industeel's historic site at Le Creusot, and for the largest reactor parts Framatome depends on Japan Steel Works. A new forge does not by itself remove the single points of failure upstream of the press.

Who can impose priority when civil and military demand collide?

When a submarine yard and a civil nuclear programme want the same press in the same months, someone has to rule who goes first. That precedence is not a technical clause; it is a legal and political instrument. At EU level the EDIP Regulation allows priority-rated orders; in France the Code de la défense gives the state requisition powers over strategic production. Owning or financing capacity is not the same as holding the right to use it ahead of others — and that right is held by the state, not the customer.

The report sets out the two build-outs site by site, the qualification bottleneck and the upstream dependencies, and the specific legal instruments of priority, with the decision points for buyers, financiers and suppliers running due diligence on this base.

Sources

  • Sheffield Forgemasters company statements (2023–2026).
  • UK House of Lords written answer HL15445 (answered 26 March 2026).
  • UK Ministry of Defence, "First British-made artillery barrels delivered to Ukraine" (15 July 2026).
  • Framatome & RTE, Projet Forge+ — dossier de concertation préalable (May 2025).
  • Regulation (EU) 2025/2643 (EDIP), OJEU 29 December 2025; French Code de la défense (consolidated 1 October 2026).

Choose how to continue

Go deeper on this question

Cover of the report Heavy Forgings, Defence Demand and Priority Powers Full sourced report Heavy Forgings, Defence Demand and Priority Powers 19-page PDF · immediate download · €299 View the report →

Original DFM analysis

Heavy Forgings, Defence Demand and Priority Powers

Type DFM Analysis report
Published 2026-11-20 (Platform publication)

The publication details above identify the source used for this public thread.

Related DFM Platform threads

Explore this category Analysis

Defence Finance Monitor is an analytical and informational product. It does not constitute investment advice, financial advice or a recommendation to buy or sell securities. Payments for Professional Packs are processed securely by Stripe at checkout.