DFM Platform

Analysis

What does the PFAS firefighting foam transition require of EU defence sites?

The DFM report on this question — Defence Fire Protection Through the PFAS Foam Transition 24-page PDF · immediate download · €299

Follow Platform Systems & Legacy Platform Modernisation — free alerts: new analyses and updates on this theme

Privacy.

This public thread presents the concise analytical answer. The complete evidence, source base and assessment are available below.

Part of our Policy, Procurement & Institutions and Legal, Regulatory & Advisory coverage →

Platform publication · DFM Analysis report · 2026-11-24

Analysis as of 11 October 2026.

Key facts

  • Regulation (EU) 2021/1297 allowed C9–C14 PFCAs in Class B foam already installed in mobile or fixed systems only until 4 July 2025, and that derogation has expired (Regulation (EU) 2021/1297, 4 July 2025)
  • The derogation for PFOA, its salts and PFOA-related compounds in Class B foam already installed in systems ended on 3 December 2025, the date substituted by Delegated Regulation (EU) 2025/1399 (Regulation (EU) 2019/1021, 3 December 2025)
  • Until 3 August 2028, already installed Class B foam can benefit from trace limits of 1 mg/kg for PFOA and its salts and 10 mg/kg for PFOA-related compounds (Regulation (EU) 2019/1021, 3 August 2028)
  • Entry 82 ends the derogations for training, testing and fire-service use on 23 April 2027, while foam for Seveso III establishments may continue to be used until 23 October 2035 (Entry 82, 23 April 2027)
  • Management-of-change guidance states that fluorine-free foams are not a 'drop-in' replacement for the PFAS foams used for decades (Dutch LEC Industrial Safety guidance on the NIPV website, March 2023)
  • Version 2 of Kiwa's K21045-SCP10 scheme for cleaning fire-protection systems that contained PFAS foam aims to eliminate residual PFAS from tanks, piping and appendages (Kiwa announcement, 25 November 2025)

Defence establishments in the European Union are being required to move away from firefighting foams containing per- and polyfluoroalkyl substances, a change the report argues is not adequately described as a chemical substitution exercise. The extinguishing agent is only one part of a system that also includes tanks, proportioners, pumps, seals, pipework, drainage, waste routes and trained personnel. Legal deadlines differ by substance and by use, so a single site may face several of them at once. The report therefore frames the central question as whether an existing protection system can be converted, shown to remain effective, accepted for service and kept available during the transition.

Is 23 October 2026 the date when PFAS foam becomes prohibited?

According to the report, 23 October 2026 is not a general European prohibition date for PFAS-containing firefighting foam. The legal clock works as a conversion schedule. Substance-specific restrictions have already expired: the C9–C14 PFCA derogation for installed Class B foam ended on 4 July 2025 under Regulation (EU) 2021/1297, and the PFOA derogation under Regulation (EU) 2019/1021 ended on 3 December 2025. Entry 82 ends the derogations for training, testing and fire-service use on 23 April 2027, sets a 2030 general prohibition unless a longer derogation or a duly granted defence exemption applies, and allows use at Seveso III establishments until 23 October 2035. The report warns that planning from the single 2026 date risks unnecessary early replacement in one application and unlawful continued use in another. Interim duties also apply, including a management plan that must be reviewed annually and kept for at least fifteen years.

When does a fire-protection system count as converted?

The report adopts a narrow definition. Draining PFAS concentrate and delivering fluorine-free concentrate does not complete a conversion. Conversion is complete only when the agent has been selected against the protected fire scenario, the equipment is compatible with its physical and hydraulic characteristics, legacy contamination has been controlled, the system has been tested and commissioned, personnel have been trained, residues have an authorised treatment route and the operator has accepted the arrangement. Dutch guidance published in March 2023 states that fluorine-free foams are not a drop-in replacement. Proportioners may need to be cleaned, modified or replaced, because higher-viscosity fluorine-free concentrates can challenge existing equipment. Residual PFAS on internal surfaces can contaminate the replacement foam, which is why the rules permit 50 mg/L for the sum of PFAS in fluorine-free foam from equipment cleaned using best available techniques.

Where does the readiness risk lie for defence operators?

The report argues that the relevant readiness variable is continuity of accepted fire protection, not the percentage of PFAS foam already replaced. A site can be chemically advanced but operationally incomplete if the new system has not been demonstrated, or it can keep an effective system whose legal use is approaching expiry. As a result, the critical path can sit in engineering, testing, waste acceptance or operator qualification even when suitable concentrate is commercially available. Waste treatment adds further constraints. The operative requirement is that PFAS be destroyed or irreversibly transformed, and the recitals exclude biological wastewater treatment and incineration below 1,100 °C, although the operative text of entry 82 does not itself state a temperature. Cleaning assurance is starting to formalise, with Kiwa announcing version 2 of its K21045-SCP10 scheme on 25 November 2025.

Sources

  • See the full report for the complete, linked source list.

Choose how to continue

Go deeper on this question

Cover of the report Defence Fire Protection Through the PFAS Foam Transition Full sourced report Defence Fire Protection Through the PFAS Foam Transition 24-page PDF · immediate download · €299 View the report →

Original DFM analysis

Defence Fire Protection Through the PFAS Foam Transition

Type DFM Analysis report
Published 2026-11-24 (Platform publication)

The publication details above identify the source used for this public thread.

Related DFM Platform threads

Explore this category Analysis

Explore related themes Legal & Regulatory Risk

Defence Finance Monitor is an analytical and informational product. It does not constitute investment advice, financial advice or a recommendation to buy or sell securities. Payments for Professional Packs are processed securely by Stripe at checkout.