An Army Ordering Vehicle for Human Performance
Can BeaverFit convert one SBIR readiness kit into $350 million of repeatable, American-made human-performance capacity?
28 pages · PDF · Analysis as of 12 August 2026
€299 excl. VAT
- ✓ Instant PDF download — personal link valid 72 hours, up to 5 downloads
- ✓ VAT invoice issued for business purchases
- ✓ 28 pages · contents page · sources listed
- ✓ Purchase order, bank transfer or multiple copies: contact us
Get the free extract by email
The summary, the contents page and one sample page — sent to your inbox, with a follow on this theme so you get one alert when a new analysis lands. No charge.
Need a quote or invoice for your purchasing office?
Tell us the essentials and we'll send a formal quote or invoice — same listed price, purchase orders and multiple copies welcome.
What you'll learn
- On 4 August 2026 the Department of War announced a $350,000,000 firm-fixed-price, single-award indefinite-delivery, indefinite-quantity contract to BeaverFit North America LLC of Reno, Nevada, for the design and construction of Holistic Health and Fitness structures, other human performance structures, wide span structures, and human performance equipment and systems as outlined in the Small Business Innovation and Research H2F Readiness Kit, with an estimated completion date of 4 August 2033.
- One bid was solicited via the internet and one was received.
- The ceiling stands against three magnitudes drawn from the same programme’s own record.
Inside this report — 12 sections
- What the Army legally awarded
- H2F demand is broader than a building programme
- From A234-005 to the 2026 vehicle
- The unresolved Phase III question
- Why BeaverFit is the only contract holder
- The fiscal and real-property gate
- Technical architecture, design authority and data rights
- What “American-made” can establish, and what capacity can
- Corporate structure, the federal record and the competitive field
- From ceiling to orders, obligations and revenue
- Testing the thesis and its counterhypothesis
- Final assessment
≈ $327 — charged in euros; ECB reference rate.
A VAT invoice is issued for business purchases. One click to Stripe — guest checkout, no account. Download on the confirmation page and by e-mail (72 hours, up to 5 downloads).
Sold by STRONCATURE S.R.L. (VAT IT05960160652) · Prepared by the DFM research desk — editor: Nunzio Mastrolia.
Follow European defence funding & industry — free alerts: new analyses and updates on this theme
Inside this report
- What the Army legally awarded
- H2F demand is broader than a building programme
- From A234-005 to the 2026 vehicle
- The unresolved Phase III question
- Why BeaverFit is the only contract holder
- The fiscal and real-property gate
- Technical architecture, design authority and data rights
- What “American-made” can establish, and what capacity can
- Corporate structure, the federal record and the competitive field
- From ceiling to orders, obligations and revenue
- Testing the thesis and its counterhypothesis
- Final assessment
Sample page
One full page from the report, exactly as delivered (28 pages in total).
Sources
This report is built only from primary and official sources, cited in the document as of 12 August 2026 — 15 distinct sources including acquisition.gov, armysbir.army.mil, beaverfitusa.com, dvidshub.net, find-and-update.company-information.service.gov.uk, gao.gov, h2f.army.mil, highergov.com, hnc.usace.army.mil, law.cornell.edu, mrsi.erdc.dren.mil, patents.google.com, sbir.gov, uscode.house.gov, war.gov. The source material itself is in the report, not on this page.
The analysis is public. The report is the document of record.
The analysis behind this report is published openly on DFM — that is how we work, and it does not change what you are buying. What you buy is the professional edition of that analysis: a dated, complete document with every source cited, structured for desk use, licensed to you, and citable in your own work. The free page is where the analysis lives; the report is what you file, rely on and cite.
Related reports
Methodology, format & delivery
DFM reports are built from primary and official sources — TED procurement notices, CORDIS and the EU Funding & Tenders Portal, EIB operations, the NATO Innovation Fund portfolio, SIPRI data, official budget documents and company disclosures — read together with the underlying legal texts. Sources are cited in the document; it reflects them as of its publication date (12 August 2026). You receive a 28-page report (PDF), watermarked to you on every page, delivered on the confirmation page and by e-mail immediately after checkout (personal link valid 72 hours, up to 5 downloads). Guest checkout, single-user licence — Terms of Sale.
Related on DFM
Read the free public analysis behind this report · More Strategic reports · All reports
For your role
Investors
Investment intelligence on this company or segment
Request an investment-intelligence brief →SMEs & scale-ups
Position your capability with European programmes
Request a positioning & funding-eligibility check →Universities & research
Technology scouting and multi-seat access for your group
Request technology scouting / team access →Legal & compliance
Eligibility, export-control and regulatory analysis
Request a compliance analysis →Institutional & team access. Labs, primes and universities can equip a whole desk — multi-seat / institutional licensing. Request team / institutional access →
Stay on this subject
One alert when something moves: new calls, deadline changes, updated editions and related reports.
Follow — free alerts