Paying for Faster Aster Production
OCCAR’s Aster contracts of 2022–2026 disclose volumes and sites, but not who funds the new capacity
Hypersonics & Advanced Missile Systems France Italy United Kingdom
18 pages · PDF · Analysis as of 09 October 2026
€299 excl. VAT
Invoice with VAT ID · EU reverse charge automatic · watermarked single-user copy · instant download
What you'll learn
- In March 2025 France, Italy and the United Kingdom confirmed an order for 218 additional Aster surface-to-air missiles and, within the same trinational procurement, the faster delivery of missiles that France and Italy had ordered at the end of 2022.
- Eleven months later, a further amendment to the same contractual framework provided for new capacity in Italy to integrate, maintain and repair Aster missiles.
- Each step was announced, dated and attributed to the bodies that signed it: the Organisation for Joint Armament Cooperation (OCCAR), which contracts on behalf of the participating states, and Eurosam, the grouping formed by MBDA and Thales that acts as prime contractor.
A contents-paged report: a company's structure, portfolio, programme participation and funding record — or a market question measured with a stated method and full bibliography. Use it to check a counterparty or a claim before committing time or budget.
≈ $331 — charged in euros; ECB reference rate.
EU VAT calculated at checkout; invoice issued after payment. One click to Stripe — guest checkout, no account. Download on the confirmation page and by e-mail (72 hours, up to 5 downloads).
Sold by STRONCATURE S.R.L. (VAT IT05960160652) · Prepared by the DFM research desk — editor: Nunzio Mastrolia.
Follow Paying for Faster Aster Production — free alerts: new calls, deadline changes, updated editions
What this report establishes
“Paying for Faster Aster Production” is a sourced, structured Defence Finance Monitor analysis, closed on 09 October 2026. It establishes what is at stake, who the actors are and what it means for European defence funding and industry — drawn only from primary and official sources. This page summarises what the 18-page report determines; the figures, the evidence and the conclusions are in the report itself.
Who it's for
Strategy, corporate-development and investment teams that need an ecosystem-level view — budgets, industrial capacity and technology landscapes — before committing capital or capacity.
Key questions this report answers
- What is the central argument of “Paying for Faster Aster Production”, and why does it matter for European defence and dual-use markets?
- How does the analysis address the contract chain, 2022 to 2026?
- How does the analysis address what the record discloses about money?
- What does this mean for European defence funding, procurement and investment decisions?
Inside this report
- The contract chain, 2022 to 2026
- What the record discloses about money
- What the OCCAR Convention says about title
- Applying the rules to the new Aster capacity
- Conclusion
Sample page
One full page from the report, exactly as delivered (18 pages in total).
Sources
This report is built only from primary and official sources, cited in the document as of 09 October 2026 — 7 distinct sources including assets.publishing.service.gov.uk, defense.gouv.fr, eurosam.com, mbda-systems.com, occar.int, prod-site-internet-minarm-admin.cloud.defense.gouv.fr, questions-statements.parliament.uk. The source material itself is in the report, not on this page.
Related reports
- Europe’s Defence Overruns, Measured — pages · €
- Europe’s Military Space Gap — pages · €
- Europe’s Anti-Ballistic Coalition — pages · €
- Operational Control in Europe’s Governmental Satellite Communications — pages · €
- Emerging Defence and Dual‑Use Technology Clusters in Europe — pages · €
- Edgewing Joint Venture for GCAP: Technical and Institutional Analysis — pages · €
What this report covers
Technologies: Hypersonics & Advanced Missile Systems. Countries: France, Italy, United Kingdom. A sourced, structured 18-page analysis for European defence and dual-use decision-makers, from the DFM research desk and built on official and primary sources.
Related reports
Methodology, format & delivery
DFM reports are built from primary and official sources — TED procurement notices, CORDIS and the EU Funding & Tenders Portal, EIB operations, the NATO Innovation Fund portfolio, SIPRI data, official budget documents and company disclosures — read together with the underlying legal texts. Sources are cited in the document; it reflects them as of its publication date (09 October 2026). You receive a 18-page report (PDF), watermarked to you on every page, delivered on the confirmation page and by e-mail immediately after checkout (personal link valid 72 hours, up to 5 downloads). Guest checkout, single-user licence — Terms of Sale.
Related on DFM
More Strategic reports · Hypersonics & Advanced Missile Systems · France · Italy · United Kingdom · All reports
For your role
Investors
Investment intelligence on this company or segment
Request an investment-intelligence brief →SMEs & scale-ups
Position your capability with European programmes
Request a positioning & funding-eligibility check →Universities & research
Technology scouting and multi-seat access for your group
Request technology scouting / team access →Legal & compliance
Eligibility, export-control and regulatory analysis
Request a compliance analysis →Institutional & team access. Labs, primes and universities can equip a whole desk — multi-seat / institutional licensing. Request team / institutional access →
Stay on this subject
One alert when something moves: new calls, deadline changes, updated editions and related reports.
Follow — free alerts