DFM Platform

EDIP — Who Can Apply, Under What Control Conditions, and By When

Edition 4 as of 2026-11-08 updated nightly

23 verified citations · 8 live calls from the verified database · updated editions

€199 excl. VAT

Invoice with VAT ID · EU reverse charge automatic · watermarked single-user copy · instant download

8 live call(s) in this edition

CallTitleDeadlineWindow
EDF-EDIP-P-2026-2027-FNLC-SA-SEAPSupport for the functioning of SEAPs, including for the purpose of establishing12 Nov 2026Closing soon
EDF-EDIP-P-2026-FNLC-CSA-PREPMaturing projects for possible future European Defence Projects of Common Intere15 Dec 2026Still open
EDF-EDIP-P-2027-FNLC-CPA-AMDSAir and missile defence systems16 Feb 2027Still open
EDF-EDIP-P-2027-FNLC-CPA-C5ISRSC5ISR and other space-related products16 Feb 2027Still open
EDF-EDIP-P-2027-FNLC-CPA-GNPSGround and naval platforms and systems16 Feb 2027Still open

…and 3 more in the full table (PDF + CSV).

What's inside

  • The answer first
  • Who can apply?
  • Ownership and control
  • Consortium requirements
  • Co-financing: what the Union actually pays
  • The Ukraine Support Instrument
  • Prerequisites before you commit bid resources
  • Procedure
  • Common mistakes
  • Points of contact
  • What this analysis could not verify
  • Sources

Who it's for

Bid and capture teams sizing an application; counsel and compliance checking establishment, ownership-and-control and consortium rules; investors and analysts who need the access conditions verified against the legal text, not summarised from news.

A decision-grade guide to eligibility under the European Defence Industry Programme, grounded article by article in Regulation (EU) 2025/2643 of 16 December 2025: who may apply (Article 9(1) establishment and executive management), where assets must sit (Article 9(3)), the ownership-and-control gate and its guarantee derogation (Articles 9(5)-(9), with Regulation 2019/452 screening as reference), consortium arithmetic for common procurement and industrial reinforcement (Articles 11-12 and the 15-entity ceiling of Article 21(3)(c)), the real co-financing rates (15/25, 35/50 and 100 per cent under Articles 20 and 33), the Ukraine Support Instrument perimeter (Articles 22, 26, 33), prerequisites, procedure, common mistakes and points of contact. Live calls, deadlines and budgets are appended by the platform from its verified database at each edition.

What changed

1 call(s) closed or changed: EDF-EDIP-USI-2026-LS-IRA-MAB Part A revised (edition 4).

Licensed single-user copy, watermarked. Your download link serves the latest edition for 90 days (max 10 downloads). Invoice with VAT ID; EU reverse charge applied automatically at checkout.

Related eligibility reports

Follow EDIP — Who Can Apply, Under What Control Conditions, and By When

One alert when something moves: new calls, deadline changes, updated editions.